Overhaul of High School Plant Room

Scope of Work:

Removal of redundant boilers and installation of new cascade boilers, headers, plate heat exchangers and all associated pumps.

Project date:

August 2022

Client:

South Staffordshire Educational Trust

Location

Chase Terrace Academy, Cannock.

  • The project was carried out during school holidays and was completed before the return of the pupils for the new school term.
  • The plate heat exchanger was lifted by crane through the roof of the plant room and piped in welded steel.
  • 6  Frame mounted boilers were installed in a cascade system complete with individual shunt pumps and new flue header and flue to roof level.
  • The existing gas main did not comply to current legislation and was replaced with fully welded steel pipework with correct isolation valves, test and purge points.
  • As part of the project all the system controls were updated and integrated with new equipment.